Spectro™ application note · UPS
Battery Check in Seconds for UPS Systems
Find weak batteries in a UPS string during routine service.
Backup runtime depends on the usable capacity of the battery string. A rapid test gives technicians a way to flag supported batteries for follow-up and prioritize maintenance between scheduled system tests.
30 sec
Typical test time for supported batteries
60%
Example deep-cycle screening threshold
Multi-Model EIS
Non-invasive battery screening
Screen individual batteries in the string
Compare batteries of the same model under consistent test conditions. Investigate outliers and confirm system runtime using the UPS manufacturer’s maintenance and acceptance procedures.
Use the 60% example as a starting point for discussion. The appropriate threshold depends on the battery, the application and the reserve needed before the next charge or service.
From a rapid test to a service decision
Select a matrix
Choose a supported test matrix for the battery and application. Ask Cadex about compatibility before testing.
Measure battery condition
Spectro uses Multi-Model electrochemical impedance spectroscopy to assess capacity and state of charge without a full discharge test.
Review the result
Compare the reading with the required reserve and the battery’s history. Use the result to decide whether the equipment needs further checks or service.
Keep a record of each battery test
CadexLink collects test results from compatible Spectro devices and can send them to CadexCloud. Use battery identifiers to find prior records and track changes between service intervals.
Explore CadexCloudFind a test matrix for your batteries
Talk with Cadex about battery compatibility, test settings and service workflows.