Spectro™ application note · Buses

Assuring Hotel Load in Transit

Check whether bus batteries can cover accessory loads and still restart the engine.

Lighting, ventilation, and other equipment can draw power while the engine is off. Capacity testing gives fleet technicians a view of the reserve available for those loads alongside cold-cranking performance.

Buses

30 sec

Typical test time for supported batteries

50%

Example bus starter capacity threshold

Multi-Model EIS

Non-invasive battery screening

Check the energy available between starts

Measure both capacity and cold-cranking amps (CCA). A battery can still crank well even as the energy available for hotel loads declines. Set the capacity threshold around the bus’s accessory load, route, and service interval.

Use the 50% example as a starting point for discussion. The appropriate threshold depends on the battery, the application and the reserve needed before the next charge or service.

Chart comparing capacity and cold-cranking amps as starter batteries age

From a rapid test to a service decision

Select a matrix

Choose a supported test matrix for the battery and application. Ask Cadex about compatibility before testing.

Measure battery condition

Spectro uses Multi-Model electrochemical impedance spectroscopy to assess capacity and state of charge without a full discharge test.

Review the result

Compare the reading with the required reserve and the battery’s history. Use the result to decide whether the equipment needs further checks or service.

Spectro connects to CadexLink, which can share test records with CadexCloud

Keep a record of each battery test

CadexLink collects test results from compatible Spectro devices and can send them to CadexCloud. Use battery identifiers to find prior records and track changes between service intervals.

Explore CadexCloud

Find a test matrix for your batteries

Talk with Cadex about battery compatibility, test settings and service workflows.

Request a Free Demo